Current Status

    • The work on the central spine road already started
    • Government allocates 1700 Hect. land for adjoining Airport
    • Anchor Tenants already in place
    • Water logging, seismological & environment studies underway
    • The legal framework enacted: The SIR Act 2009
    • Project development corporation (GICC) formed
    • Development Plan sanctioned on 10 /09/2012
    • Town Planning Scheme (TPS) no. 1 and 2 sanctioned on 3/10/2012
    • Town Planning Scheme no. 3, 4, 5 and 6 have been submitted to Apex Authority (GIDB) on 13/12/2012 for sanction
    • Tenders for selection of consultants for preliminary design of roads including utilities for TPS no. 2 have been floated
  • About Group

  • Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s

    Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s

    Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s

  • About Group

  • Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s

    Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s

    Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s

feedback